Validating Simulation Model Cycle Times at Seagate Technology

Navdeep Grewal, Timbur Wulf, Alvin Bruska
Seagate Technology
Jennifer Robinson, Ph.D., FabTime Inc.

Abstract

This paper describes the validation of cycle times in a factory simulation model of a new Recording Head Wafer manufacturing facility at Seagate Technology, Minneapolis, MN. The project goals were to determine which factors were causing cycle time deltas between the model and the actual factory, and to add detail to the simulation model to bring cycle times closer to reality. The study found that the most significant contributors to the cycle time delta were number of tools, number of operators, level of operator cross-training, and assumptions about rework, downtime, and equipment dedication.

For a copy of this paper, please email [email protected] and include the title of the paper and your mailing address.

Call today for more information from Wright Williams & Kelly, Inc. Providing software solutions for productivity measurement and enhancement since 1991.

Back to Top

 

 

 

SITE MAP 1SITE MAP 2SITE MAP3

6200 Stoneridge Mall Road • 3rd Floor • Pleasanton, CA 94588 • Tel 925-399-6246 • Fax 925-396-6174
©1995-2015 Wright Williams & Kelly, Inc. • All Rights Reserved • Email: [email protected]