• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
wwk-logo

WWK

when it comes to cost, we answer the whys

  • Translate
  • Home
  • About
  • Products
  • Training
  • Consulting
  • Contact
  • Show Search
Hide Search

Cost, Risk, & ROI Analysis

TYPICAL QUESTIONS WE ANSWER:

  • What is the true cost?
  • What are the major cost drivers?
  • What is the trade-off between cost and risk?
  • How can I lower costs?
  • What is the risk vs. cost benefit for a new project or product?
  • What is the expected return on investment (ROI)?
  • How do the risks of a project impact costs and ROI?

EXAMPLE CONSULTING PROJECTS:

Click on the “Related Links” for more information

Project DescriptionCompany DescriptionBenefitsRelated Links
Manage/execute Air Force MANTECH programDefense contractorReduce cost of major ECM product
Consolidate/simplify product designDefense electronicsReduce parts & options counts, costs
Implementation of cost Of ownership analysis for electronic assembly industry.  Adapting cost of ownership methodology for electronic assembly equipmentElectronic assembly equipment manufacturerUnderstand true manufacturing costACM Jun 1999, p.9
Cost analysis of test system and wafer prober combinationEquipment supplierCombined COO
Cost analysis of 300mm manufacturing support toolEquipment supplierCOO
Integrated analysis of cost of ownership for a new metrology inspection equipment and its impact throughout the fabrication process flowEquipment supplierEquipment performance impact to productionACM Mar 1999, p.1
Review and assess equipment designs for quality, reliability, safety, manufacturability, and maintainabilityEquipment supplierHigher quality reliability, and safety; better maintainability and manufacturability; lower COOLink to recommended book “Hi-tech Reliability”
Reliability predictionsEquipment supplierHigher reliability; lower COO
Reliability test, ­ planning and results analysisEquipment supplierHigher reliability; lower COO
Cost analysis impact of production test time to cost of ownership, good wafer throughput and OEEEquipment supplierLower COO of test time
Created product costing models for three different flat panel display manufacturing technologiesFPD manufacturerStrategic advantage
Forecast impacts of a new technology on the cost and profitability of a semiconductor wafer fabResearch & development organization Validate continued R&D, establish marketing strategyACM Sep 2001, p.5
Cost of ownership analysis comparing equipment for new gate process Semiconductor manufacturing Equipment with lower COO
Cost of ownership analysis comparing new process and materials on photolithographySemiconductor manufacturingJustification of additional cost resulting in lower COOACM Fall 2005, p.1
Integrated supply chain evaluation of cost structures for commercialization of ChipSeal process from military applicationSemiconductor materials supplierCombined cost analysis
Comparison financial analysis to understand process cost impact of interlayer dielectric materialsSemiconductor materials supplierLower cost
Evaluation of cost of ownership for new CVD and CMP processesSemiconductor materials supplierLower cost
Evaluated a passivation material and process technology for overall product cost inpact on semiconductor fabrication and final assemblySemiconductor materials supplierLower cost
Comparison financial analysis to understand process cost impacts of planarization methodsSemiconductor materials supplierOptimizationACM Sep 1999, p.10
CMP Drivers
metal-cube

CLICK HERE for

  • Item #1
  • Item #2
  • Item #3
wwk-logo

Primary Sidebar

Consulting Examples

  • Cost, Risk, & ROI Analysis
  • Lean Manufacturing & Productivity Consulting
  • Software & Integration Consulting
  • Quality, Reliability & Statistics Consulting
  • Supply Chain Analysis Consulting
  • Benchmarking & Competitive Analysis
  • New Product Introduction & Analysis

Footer

Wright Williams & Kelly, Inc. is the largest privately held operational cost management software and consulting company serving technology-dependent and technology-driven organizations.

Address:
111 Deerwood Road, Suite 200
San Ramon, CA 94583

Phone: +1 925-831-4808
Fax: +1 925-396-6174
Email: [email protected]

  • Home
  • About
  • Products
  • Training
  • Consulting
  • Contact
  • Newsletter Archive
  • LinkedIn
  • Twitter
  • YouTube

© 2026 Wright Williams & Kelly, Inc.